NEW KITBenchmark RPC latency, errors and cost before switching providers →
rpc.run

GetBlock directory launch readiness · 2026

GetBlock directory publication plan: what to finish before submitting, where to submit, and in what order

A practical, source-based launch plan for turning GetBlock's existing product pages, pricing, docs, case studies, comparison pages, AI/MCP assets, and rpc.run free tools into a directory/review/listing campaign.

Executive summary

GetBlock is not starting from zero. The current public site already has most of the trust foundation directories expect: pricing, docs, status/SLA, privacy/terms, case studies, comparison pages, machine-readable LLM files, and an AI/MCP angle.

The remaining work is not core positioning. It is the submission layer: asset kit, rendered SEO/schema QA, dedicated ICP landing pages, a review collection engine, and a launchable free-tool asset for Product Hunt / DevHunt style surfaces.

Go now
Entity profiles, dev/SaaS listings, StackShare, SourceForge, Slashdot, AlternativeTo/SaaSHub after schema QA.
Wait
G2/Capterra/TrustRadius until review candidates and ask sequence are ready.
Build first
Directory kit, ICP pages, AI-agent page, MCP page, rpc.run free tools.

What GetBlock already has

AssetEvidence / URLDirectory value
Public homepagegetblock.ioPrimary brand destination.
Pricingpricing + pricing.mdHard requirement for many SaaS/review directories.
Docsdocs, docs LLM exportDeveloper trust, API listing proof, AI citation fuel.
Legal/trustprivacy, terms, SLA, statusRemoves submission blockers for serious directories.
ComparisonsQuickNode, Alchemy, Infura, Helius, Chainstack, dRPC, Ankr, Moralis, TatumStrong destinations for AlternativeTo/SaaSHub and competitor-intent traffic.
Case studiesTangem, Trust Wallet, ChangeNOW, EtherDrops, Blockaid, Revert.FinanceNeeded for enterprise/review credibility.
AI/GEO materialllms.txt, llms-full.txt, MCP docs, getblock.aiUseful for AI directories and LLM answer surfaces.

What is missing before serious directory publication

  1. Directory asset kit. Logo SVG/PNG, square icon, screenshots, demo video, descriptions, tags, founder/company blurb, proof bullets.
  2. Rendered SEO/GEO QA. Verify single H1, canonical, OG image, FAQ schema, Product/SoftwareApplication/Organization JSON-LD, and CTA health on the pages used as directory destinations.
  3. Dedicated ICP landing pages. Homepage use-case cards exist, but directory traffic should land on focused pages for enterprise blockchain teams, RPC/API teams, Web3 infra teams, AI agents, wallets, and analytics/indexers.
  4. Review engine. G2/Capterra/TrustRadius need at least 20 review candidates and a 10-in-30 ask plan. A zero-review listing is weak.
  5. Launchable free-tool asset. Product Hunt/DevHunt should launch a concrete tool/hub, not the generic mature GetBlock website.
  6. AI/MCP landing page. The AI angle exists, but directory submissions need a single clear page: what it is, install/use path, examples, safety notes, and CTA.

P0: submission asset kit

Create a single internal/public kit before any batch. This prevents inconsistent descriptions and asset scrambles.

AssetRequirementUse
Logo packSVG, transparent PNG, square 1024×1024, faviconAll directories.
Screenshots5–8 current product screenshots, 1920×1080Product Hunt, G2, Capterra, SaaS directories.
Demo video60–90 seconds, no hype, show endpoint creation + request + dashboard/statsProduct Hunt, DevHunt, review sites.
Descriptions10-word tagline, 60-char short, 150-word long, 500-word detailedCopy variants per tier.
Proof bullets130+ networks, 50B+ monthly requests, 200k+ users, SOC 2 Type II, 99.99% dedicated SLAEnterprise/review positioning.
Destination mapOne URL per directory surfaceAvoid homepage-only backlink waste.

P1: pages to create or update before submissions

Dedicated ICP/use-case pages

Comparison page updates

Existing comparison pages are valuable. Before directory traffic, verify or add: FAQ schema, honest “choose competitor when…” section, last-updated date, pricing caveat, and CTA to migration or benchmark.

Trust and proof updates

rpc.run tools

Use rpc.run as the launchable asset layer: archive estimator, RPC cost/plan-fit calculator, SLA/reliability risk calculator, migration estimator, indexer-vs-RPC tree, RFP checklist, error decoder, compatibility checker, agent-safe RPC readiness checker, and endpoint health checker.

P2: rendered SEO/GEO QA checklist

Run this on every destination page before using it in a directory listing.

Positioning variants

Web3 infrastructure

Tagline: Reliable multichain RPC infrastructure for production Web3 teams.

Use for StackShare, SourceForge, Slashdot, dev profiles, and infra directories.

RPC/API

Tagline: Blockchain RPC/API access with predictable production control.

Use for AlternativeTo, SaaSHub, API/tool directories, and comparison-driven listings.

Enterprise blockchain

Tagline: Enterprise RPC reliability for blockchain products that cannot silently fail.

Use for G2, Capterra, TrustRadius, procurement and enterprise directories.

AI-agent infrastructure

Tagline: Live RPC infrastructure for AI agents that touch crypto.

Use for AI directories and MCP/agent registries once the dedicated page/tool exists.

Submission order and rules

OrderSurfaceDestinationRule
1LinkedIn Company, Crunchbase, GitHub profile/orgHomepage, docs, GitHubEntity authority first. Keep factual and consistent.
2StackShare/nodes/, docs, GitHubLead with developer stack and API coverage.
3SourceForge / SlashdotHomepage or /nodes/Use Web3 infra variant, no crypto hype.
4AlternativeToComparison pagesUse alternative framing; submit only after comparison-page schema QA.
5SaaSHubComparison pages + pricingUse RPC/API variant and ensure categories/tags are specific.
6Dev.to / Hashnode / technical articlesCanonical blog/report/tool pagesCross-post technical writeups with canonical link back.
7Product Hunt / DevHunt/tools/Only after a real free-tool hub exists; ask for feedback, never upvotes.
8AI directories: TAAFT, Futurepedia, ToolifyAI-agent RPC page or agent-safe readiness toolOnly if framed as AI/on-chain live-state infrastructure.
9MCP/agent registries: Glama, APITracker, LF MCP RegistryMCP install/docs pageOnly if there is a real installable MCP server with examples.
10G2 / Capterra / TrustRadiusEnterprise use-case + case studies + SLADo not start without review campaign and 20 review candidates.

Weekly execution timeline

Week 0 — readiness build

  1. Assemble asset kit.
  2. Run rendered SEO/GEO QA on homepage, pricing, nodes, dedicated, limitless, enterprise, SLA, case studies, and comparison pages.
  3. Patch missing schema/FAQ/canonical/OG issues.
  4. Choose one destination URL per directory type.

Week 1 — foundation submissions

  1. Claim/update LinkedIn, Crunchbase, GitHub.
  2. Submit StackShare, SourceForge, Slashdot.
  3. Submit AlternativeTo/SaaSHub using comparison pages.
  4. Log status and backlink URL in tracker.

Week 2 — content and ICP layer

  1. Publish ICP pages.
  2. Publish one “best RPC providers / RPC alternatives” honest category article.
  3. Cross-post technical versions to Dev.to/Hashnode.

Week 3 — free-tool launch

  1. Launch rpc.run tools hub.
  2. Submit Product Hunt/DevHunt only after the tools are live and unique.
  3. Use Show HN only for a real technical benchmark/checker angle.

Week 4 — reviews

  1. Prepare 20 review candidates.
  2. Submit/claim G2/Capterra/TrustRadius.
  3. Run 10-in-30 review request protocol.

Per-submission operating rules

  1. Use a unique positioning variant. Do not paste the same long description everywhere.
  2. Submit only to directories where GetBlock is a genuine fit.
  3. Prefer destination pages over homepage links when the directory allows deep links.
  4. Log every submission: date, directory, URL, login owner, status, moderator notes, backlink status.
  5. After approval, verify the public listing and backlink. If the link is nofollow, still record it but do not count it as SEO-equivalent.
  6. Do not claim comparative superiority without source-backed proof and last-updated dates.
  7. Review pages quarterly; do not edit every week unless the product materially changed.

Immediate next actions

  1. Build the asset kit.
  2. Run rendered SEO/schema QA on the 12 most important existing GetBlock pages.
  3. Publish the first 4 ICP pages.
  4. Complete the rpc.run tools hub and first three calculators.
  5. Begin foundation submissions, then review-site submissions only after review candidates are ready.